Investment Overview
*** CALL FOR OFFERS — OFFERS DUE THURSDAY, DECEMBER 17, 2026 ***
This property is being offered through a call-for-offers process. All offers must be submitted by December 17, 2026. Call for pricing guidance.
Next steps: sign the NDA, access the data room, tour the site, and submit your offer before the December 17 deadline.
Data Center / Industrial Site, North Memphis — 1231 Pope St, Memphis, TN 38108
±49.82 acres across 9 parcels, per the recorded deed. Delivered cleaned and remediated, with two substations on site, 161 kV transmission, two short-line rail spurs, metro fiber and gas.
Power at a Glance
4.5 MW served today, and the potential for 4.4 MW per qualifying parcel without having to go through an MLGW study. Separate users; call for details. Edge-friendly power cost: TVA's data center Capacity Commitment Charge applies only above the first 5 MW.
Gas
Two high-pressure MLGW mains (6" and 4", 61–99 PSIG) on site.
Delivered Flat & Clean
The site is delivered cleaned and remediated. ±185,000 SF of buildings can stay (buyer's choice), or have them removed: a ±100,000 SF warehouse, a ±40,000 SF office building and a ±45,000 SF industrial building attached to the office.
Zoning
Zoned IH (Heavy Industrial) / EMP. Suited to edge data center, cold storage, IOS, manufacturing, and heavy industrial users. Data center use is subject to City of Memphis data center standards adopted Oct 20, 2026, including a temporary permitting pause; buyers should confirm requirements with the City.
Offering
9 APNs: 043009 00111, 043007 00005C, 043009 00110C, 043007 00002C, 043007 00009C, 043007 00008Z, 043009 00131Z, 043007 00007, 043009 00133. Deed available upon request. NDA required for the data room and tours.
Investment highlights
* Call for offers — offers due December 17, 2026.
* ±49.82 acres across 9 separately deeded parcels, offering flexibility to phase, subdivide or serve multiple users.
* 4.5 MW served today; the potential for 4.4 MW per qualifying parcel without having to go through an MLGW study; separate users, call for details.
* Edge-friendly power cost: TVA's data center Capacity Commitment Charge applies only above the first 5 MW.
* Two on-site substations and 161 kV transmission; metro fiber ring on site.
* Two high-pressure MLGW gas mains (6" and 4", 61–99 PSIG) on site.
* Delivered cleaned and remediated; ±185,000 SF of buildings that can stay (buyer's choice), or have them removed.
* Two short-line rail spurs, adjacent to a major rail switching yard.
* Established heavy-industrial corridor, 11 miles from xAI's Colossus, with no residential adjacency conflicts.
Current, pre-delivery condition shown. 4.5 MW reflects the current occupant's MLGW service. Potential per qualifying parcel reflects MLGW discussions, applies to separate users, and must be confirmed with MLGW. Information obtained from sources believed reliable, including the recorded deed, Shelby County records and MLGW, but not verified and not guaranteed by eXp Commercial. Acreage, power capacity, zoning, environmental condition and utilities must be independently verified by buyer. Subject to errors, omissions, prior sale or withdrawal without notice.