Investment Overview
Outstanding industrial facility with robust mechnical and electrical infrastructure
Investment Highlights
- Modern facility constructed in 1995, 1997 and 1998
- Insulated precast wall construction; 6" reinforced concrete floor
- 19' - 22' clear ceiling height;
- AEP power service with onsite substation that is dual fed by two 138 kVA steel transmission lines
- One 25 MW Parkdale owned transformer installed new in 2022
- Eight switchgear rooms with total 36,750 kVA. Primary voltage is all 12,470 volt and secondary voltage is 575 and 4160
- Plant area is temperature and humidity controlled by a total of six chillers - see info package for details
- 100% wet sprinkler coverage
- T8 and LED lighting
- Total of approximately 12,000 SF of office area (3 separate areas in the building)